Day 87 - The day before...(or what Foxie did!)

14 February 2025

Day 87 - The day before...(or what Foxie did!)

  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

The deer had a very chilled out day on the Link Field Campsites today in large numbers and the team were expecting a quieter day as it was deliberately low volunteer day but, instead, with our first booking tomorrow, we were busier than ever although with different timings to usual. 


We had contractors to meet for final sign offs of our Legionella risk assessments for The Barn and The Lodge and a final bit of electrical works to finish the heating system.  Paul spent a day moving things around the site in readiness for the weekend and also in mowing the lawn behind The Lodge ready for next week, with a speedy relaying of a paving slab near the car park to ensure the walkway is level and unbroken for those guests arriving to join us tomorrow.


With still lots to do, in a moment of Foxlease Park magic, Volunteers Neil and Sue, who arrived for their overnight stay before their first day volunteering tomorrow, arrived early evening and joined in the "finishing off" tasks left in The Barn - some larger than others.  Sue got stuck in cleaning windows and helping Hazel to stock toilet rolls and hand soaps and Neil took on the heavier task of moving a huge bag of gravel to fill the end of Barn Drive following Paul's water removal earlier in the day (we don't have a photo unfortunately as he finished in darkness mid-evening, but we'll take one tomorrow). 


Alongside that, Volunteer Catherine dropped by to deliver some things to the Site Office and ended up staying to not only give a further intensive mop to the Main Hall floor in The Barn, but also then to don coveralls and to join Emma and Volunteer Rosie in some late night painting of the kitchen in The Barn and we are SO grateful that she did as she saved a world of short people problems in reaching the highest parts of the room - some innovative paint brush extensions on broom handles were adopted to reach the highest places even with the height advantage and we definitely wouldn't have managed to do it all without her.


It's a late blog today as 4 hours of painting later and a pumpkin avoiding finish for the painters (with half an hour to spare before midnight - no Cinderella issues for Foxie) The Barn kitchen is done and looks wonderful in time for the morning.


Time for a lie down like Foxie in the photo, love Foxie x



by Emma Stevens 16 April 2025
Days 128 - 148 - Foxie returns pen to paper (or the next bumper update).
by Emma Stevens 26 March 2025
Days 117 to 127 - Foxie's Bumper Update (or when Foxie made hay)
15 March 2025
Days 112 to 116 - The highs and lows of camping (or when Foxie did the do-si-do).
by Emma Stevens 10 March 2025
Day 111 - When the Foxlease Park site office felt a bit like Piccadilly Circus.
by Emma Stevens 9 March 2025
Days 106 to 110 - When Foxie fixed floors, doors, windows, walls, ceilings and more (or Foxie's round up!)
by Emma Stevens 4 March 2025
Days 104 and 105 - When Foxie turned the campsite lights on (or OS day!)
by Emma Stevens 2 March 2025
Days 102 and 103 - When The Bothy was revived (or when Foxie's projects continued).
by Emma Stevens 28 February 2025
Day 100 + 1 - All signs point to Foxlease Park (or when Foxie took steps).
by Emma Stevens 27 February 2025
Day 100 - When Foxie got camping-ready (or when there was 100 day cake!)
by Emma Stevens 26 February 2025
Day 99 - It was a wet day on site when Carol arrived! (or when the Barn was busy).
More posts